+39 06 32609432  Mon-Fri: 9:00 – 19:00 info@studiomasciotta.it

Penne Dam

Project Description

Penne Dam is an earth fill-dam built along Tavo River and was built between 1963 and 1969. The dam is zoned with an impervious central core. Here below its relevant features are listed:
  • Max height: 34 m
  • Crest length: 438 m
  • Total Dam volume: 520.000 m3
  • Total Capacity of Reservoir: 0.9 km3

Relevant Data

Client : Consorzio di Bonifica Centro (PE)
Beneficiary : Consorzio di Bonifica Centro (PE)
Location : Tavo River - Italy
Year : 2018-2019
Tasks : Analysis of recorded data, planning and supervision of geotechnical and geophysical investigation, seismic hazard analysis, static and seismic analysis of dam stability