+39 06 32609432  Mon-Fri: 9:00 – 19:00 info@studiomasciotta.it

News

April 02 2017

The composite steel and reinforced concrete bridge, located on the crest of Gibe 3 dam in Ethiopia, has been completed by the Salini Impregilo. The structure, consisting of 15 girders with spans between 14 and 21 m, was designed by Studio Masciotta, made in Italy by Giugliano Costruzioni Metalliche, transported and assembled on site. It has been designed for exceptional loads such as those of 200 tons mobile cranes required to install the radial gates and service crane.