+39 06 32609432  Mon-Fri: 9:00 – 19:00 info@studiomasciotta.it

News

May 07 2017

GERDp Dam has reached the crest elevation in correspondence of the right and the left abutment. The dam, currently under construction, has a maximum height of 175 meters, a crest length of 1780 meters, a global RCC volume of 10.2 Mm3 and it serves a 6.400 MW Power Plant.